the men's change room/restroom in 704-L, tile is sticking up at the edges in several locations in the room and needs to be re-adheared to the floor…
The proposed activity involves swapping the electrical connections to a valve with Amphenol connectors to ease future valve replacement activities.…
703-A Room 26 Water damage repairs.…
The Barnwell Warehouse has multiple hydraulic units that were intended for the shuttered MOX project.…
Apply coatings to the roof of the occupied/office area section of 713-1N, seal leaks and repair the gutter on the north side of 713-1N.…
Excess 36" bandsaw and replace with 24" bandsaw in Building 717-8N.…
A renovation of the area will be performed prior to the installation of the new CNC Mill.…
The coolant will be drained and replaced with new coolant.…
705-N Dining Room Renovation.…
234-H Inert HVAC Installing conduit for damper controls.…