717-5N : Cut access panel in ceiling to open/close water valve.…
716-N Evaluate/repair fuel oil burner heaters.…
The EEC covers the specified renovations for the interior of building 711-2N.…
Removal and replacement of rain canopies/awnings at the 701-1K and 701-2K entry and/or exits…
Subcontractor will perform a core sampling of roofs Buildings 232-H, 264-H, and 264-2H with SRS asbestos group.…
Install Rotary Screw Compressor in Building 717-F.…
New offices will be erected in the 210-S Canister Inspection Area to support operational needs.…
Extend the purge exhaust stack to a minimum height of 60 feet above the tank top.…
The existing 241-17F CRW Surge Tank has degraded and needs replacing.…
The project entails the use of a pulsed laser to illuminate aqueous solutions containing metallic nanoparticles (primarily gold (Au) but possibly c…