709-1G, Replace tile and wallboard in ladies shower. Install new shower insert.…
Fence the 299-H Building out of the Limited Area (LA) as required and meet the needs of the 299-H facility transportation requirements.…
DOE is replacing the current media disintegrator at 703-A with the Solid State Media Disintegrator.…
Renovate 211-8H Lunch Room with new flooring, ceiling tile, paint, and appliances.…
Replace lights with LEDs at 713-N Tool Room.…
Disconnect and remove Do-All saw from Bldg. 711-N.…
Install explosion proof light fixtures at Buildings 763-118N and 763-119N.…
703-46A, Install CAT6 cable from room 123 to 113.…
Powdered materials for use in additive manufacturing (3-D printing) will be mixed using the Turbula mixer in 999-1W.…
The objective of this work is to analyze for iodine speciation in environmental samples (aqueous and solids) by testing for iodide, iodate, and org…