Construction will perform light pressure wash and paint exterior of trailers (no scraping) on 704-49E, 704-50E, 704-51E, and 704-66E.…
Clean and apply Cool Seal coating to roofs of Trailers 704-31E, 33E, 37E, 49E, 50E, 51E, and 66E.…
Replace Universal Wiring in 707-F…
This EEC includes the handling and manipulation of bacterial cultures (Biosafety Level 1 microorganisms) for testing metal reduction capability of …
Replace sprinkler head in A-wing in accordance to NFPA 25 service life requirements.…
Building 749-A is a multi-function research/lab building that supports research activities conducted by SRNL.…
105-K roof expansion joint repair at between 48 and 62 elevation by subcontractor.…
To ensure continued worker safety, next generation air monitors will be installed.…
The Tritium Facility is standardizing the Distributed Control Systems based on Emerson DeltaV DCS platform.…
There are currently employees stationed at the 263-170H warehouse, which does not have any form of air conditioning.…