F-Area Tank Farm (FTF) repair underground well water (WW) leak at 13F location.…
A new access control is to be installed on Cox Bridge Road near the end of the ATTA Range 1 berm.…
Oligonucleotides and chemicals will be used for testing in a quartz crystal microbalance.…
Koldwave recirculation HVAC unit in 773-A, Room C-069 needs to be replaced with a like-for-like unit per WO 01785798 and Procedure TE-49-007.…
Raman and absorption spectroscopy instrumentation will be used to determine the chemical and physical properties of samples by monitoring the inter…
The Radiological Evidence Examination Facility (REEF) will be used by the FBI, under the direct oversight of SRNL, for forensic examination of radi…
Repair/replace roof trough/sheet metal at 711-N, 711-2N, 711-9N.…
Disconnect and remove Rigid saw from weld test area in 711-2N.…
This modification will transition all of the head-end components of the E3S Closed Circuit TV system to IVAS.…
Remove abandoned Load Line 1 Welder Controller and Powerstat.…