Melt cell high pressure sodium (HPS) light replacement with LED light for increased visibility per E-DCF-S-02877.…
This work package provides the electrical scope to troubleshoot and repair ELLV-PNL-A to include associated breakers and wiring damaged in building…
Setup and testing of sorbent material for incorporation into the offgas mitigation train of the Mobile Melter Consolidation (MMC) effort.…
Remove the south rail stop from the 105-L transfer bay area.…
Remodel room 405 in the K-Reactor Building.…
Existing Effluent Discharge Pumps will be removed from service and pump No. 1 will be replaced with a new more reliable pump.…
The Savannah River Site Community Reuse Organization (SRSCRO) shall furnish labor, material, equipment, tools, PPE, and supplies necessary to perfo…
This activity is for the demolition of Building 717-33F, which is also known as MOX Building No. 90, and the removal and relocation of MOX sealand …
This EEC covers all low hazard, routine, and repetitive task work activities that can be performed in the Savannah River Remediation (SRR) Faciliti…
Replace light ballasts in room 400 at 704-4N.…