The outdoor Motor Control Center (MCC) requires replacement due to age and cost and availability of replacement parts.…
Installation of Insulation on Saltstone Salt Solution Receipt Tank Process Vessel Vent System Exhaust…
Remove paint from 2 in. carbon steel pipe 25 lb. oxygen header located in D-0101 (Glass Shop) per Work Order 1913362 to prepare pipe for Lockring c…
The scope of this work is to perform single and multi-step synthesis for the development of materials pertaining to photovoltaic devices such as el…
Install two doors and build walls to hold the doors.…
Southern Sector airlift recirculation wells SSR-002 to SSR-012 to be placed out-of-commission in preparation for future abandonment.…
Two monitoring wells (CRW029C and CRW030C) will be installed via RotoSonic drilling within the two bio-barriers (emulsified oil and microbial suppl…
Deploy new training training trailers and restroom trailer near existing S-Area Training Campus at 704-49S (S-Area West and West of 250-S).…
Modify Entrance Gate between 703-46A and 703-41A.…
Replace 736-A HVAC per E-SOW-A-00138 and M-SOW-A-00189.…