781-A has been has been renovated to accommodate the projects previously being completed in 305-A.…
The objective of this study is to better understand the mechanisms of iodine attenuation in wetland soils.…
This activity is to remove the presumed asbestos insulation on the steam line downstream of STM-342 (V-342).…
704-N Paint offices 5, 5A, and 5B.…
Paint Fire Water PIV/Hydrants in N-Area.…
713-2N Replace damaged section of floor plate.…
Construction forces will perform maintenance on Milling machines and Lathe(s) as needed in 717-F.…
Install solar panel and grounding rod and upgrade monitoring equipment at A-01 Outfall sampling house.…
Perform cleaning, surface preparation, coating and Touch-Ups of Melter Storage Box No. 3 (MSB No. 3) by subcontractor.…
703-23B Repaint Centerra dog kennels.…