To ensure continued worker safety, next generation air monitors will be installed.…
The Tritium Facility is standardizing the Distributed Control Systems based on Emerson DeltaV DCS platform.…
There are currently employees stationed at the 263-170H warehouse, which does not have any form of air conditioning.…
MOX-Termination has determined that portable building 252 (aka SRS-PB-01072) is now excess.…
Resurfacing, repair, replacement, and extension of paved surfaces within majority of Tritium footprint.…
Drainage improvements for Building 706-6F include installing a gutter system, roof downspouts, skirting, storm drainage boxes, and a low-profile tr…
Fencing on the north east corner of Building 706-3F is blocking access to one of two entry doors and the Fire Department Connection (FDC) on east s…
Isolation and relocation of OKUMA LU15 CNC Twin-turret lathe (DOE 008067) from Building 226-2F to 731-4N Excess Warehouse for future disposition.…
To provide a safer accessible entrance route into building, activities will include the reconfiguring of two handicap parking spaces to make them s…
This EEC covers analytical methods for Radiochemical Measurements.…