Install additional recepticals and replace flooring in 730-A Rm167.…
Various glass, ceramic and composite materials are routinely fabricated and characterized at the Aiken County Technical Laboratory (Building 999-1W…
HEPA filters will be removed and the roughing filters will remain.…
HVAC Chiller No. 1 and No. 3 cooling water vent valves are to be replaced with lighter ones and pipe hangers are to be reinforced.…
A load test is to be conducted on Melter Storage Box 3.…
Paint Fire Hydrants and PIV's in F-Area.…
709-1G, Replace tile and wallboard in ladies shower.…
Subcontractor will provide roof repairs at Building 263-170H (Tritium Warehouse).…
Subcontractor will provide roof repairs at 233-24H.…
This is a painting job to repair some fixed contamination on 281-1H Delay Basin where there is peeling.…