A simulant of the accelerated basin deinventory (ABD) dissolver solution will be prepared and then neutralized with sodium hydroxide.…
This EEC covers various routine maintenance activities that occur in MOX Complex Area warehouses 731-2F, 221-12F, 221-21F, and 221-22F.…
This activity covers the preparation (putting buildings and structures in a cold and dark state) and the demolition of buildings and structures in …
Provide emergency power to Curing room at 717-5N.…
Re-asphalt area located near building 710-14N.…
Remove and re-install ceiling in Bldg. 735-A, B-001, B001 Ext. and B-002.…
This EEC covers various general renovations and modifications for Building 705-A, such as flooring/cove base replacement, ceiling tile and wall rep…
Repair concrete intruder barrier and sealcoat asphalt cover at R-Reactor Seepage Basin closed waste unit.…
FTF Repair/replace Domestic Water Header Isolation Valve DW-V-49.…
Renovate women's restroom in Building 751-1A.…