Piping and supports will be modified to support Saltstone Hopper Overflow Container (SHOC) Modifications.…
The loose packing material needs to be removed and replaced and the joint caulked to ensure the packing material does not continue to pull out.…
Water damaged beams in buildings 717-1N, 717-3N, 717-8N, 711-N, 711-2N, 711-9N, will be cleaned and have new coatings applied.…
Verizon Wireless is upgrading the existing Mobile Access Distributed Antenna System (DAS) and multiple repeater sites located on the SRS facility t…
Cone Penetrometer Test to Support SRPPF Design…
Move the trimming and gauging, hot air decontamination (HAD), and final decontamination functions to 233-H, Room 31 in Finishing Line one (FL1).…
Mount VTC equipment to wall in 704-L Conference Room.…
This is a shipment exercise for the Basic Class.…
Replace solar panels and install grounding rods at sites FM-2B, FM-3A, FM-A7, H-17, SC-4, and U3R-4. Existing solar panels will be stored for futur…
Remove the 663-33G Handi-House door and door frame that contain asbestos and replace with new asbestos free frame and door.…