This activity is to remove presumed asbestos insulation from the 12.3 to 13.1 moisture separator and P-Trap.…
Routine electrical and mechanical fabrication, assembly, testing, installation, operation, and maintenance activities performed by R and D Engineer…
Hands-on fabrication activities covering the assembly of equipment and systems designed by the Energy Security and Engineering Department for SRNS,…
781-A has been has been renovated to accommodate the projects previously being completed in 305-A.…
The objective of this study is to better understand the mechanisms of iodine attenuation in wetland soils.…
This activity is to remove the presumed asbestos insulation on the steam line downstream of STM-342 (V-342).…
704-N Paint offices 5, 5A, and 5B.…
Paint Fire Water PIV/Hydrants in N-Area.…
713-2N Replace damaged section of floor plate.…
Construction forces will perform maintenance on Milling machines and Lathe(s) as needed in 717-F.…