Tritium operations stores used fluorescent lamps and lead acid batteries outside in a gravel laydown area between Buildings 238-H and 248-H.…
Subcontactor to mix, test and X-ray soils and concrete for various site applications.…
HVAC Chiller No. 1 cooling water vent valve is to be replaced with a lighter one and pipe hangers are to be reinforced.…
Repair reinforced concrete wall located at the east side of 730-4B building.…
Replace lights in building 789-2B. Use scaffold platforms needed.…
Isolate and abandon electrical services to various equipment in Sample Room No. 1 and No. 2 in 105-L.…
Repair damaged portion of the roof on the west end of building 710-8N.…
Weld repairs and coating on door hinges on the north east end of 711-6N.…
Replace the current A/C unit for Conference Room a with a new Carrier 3-Ton split HVAC unit.…
Scope of this work order is to install a temporary cooling system for the fourth level control room at 221-8H fan house.…