Subcontractor will provide roof repairs at Building 263-170H (Tritium Warehouse).…
Subcontractor will provide roof repairs at 233-24H.…
This is a painting job to repair some fixed contamination on 281-1H Delay Basin where there is peeling.…
Remove, replace, and paint base board wall cove base in K-Area Reactor Building (105-K) Personnel Wing.…
D and R "lean to" style outdoor storage shed (NBN, no building number) attached to the 105-L building near the Purification wing.…
Prepare Hill-Acme Metalworker for excess by disconnecting electrical, draining fluids, and transporting to storage.…
Utilization of aerial drone to apply herbicide to the roofs of 105-P and 105-R as part of normal post-closure maintenance.…
The Site Services HVAC Maintenance group will set-up a used oil storage area in an outdoor shed at Building 711-C.…
The H-Canyon air cooling units, appliance Nos. HCA-HS-222100-CHW-CHU-001 (McQuay Chiller No. 1) and HCA-HS-22100-CHW-CHU-002 (McQuay Chiller No. 2)…
Electrical panel doors and electrical boxes in 483-3D are covered with paint that has suspected PCBs and/or Lead.…