This activity involves the development of radiation resistant high density foam in support of improved D and D operations.…
This EEC covers various general renovations for Building 723-A, such as flooring/cove base replacement, ceiling tile replacement, painting, and ele…
This scope of work covers general R and D activities performed in 773-A Lab C-064, activities performed may include any of the following.…
Install additional recepticals and replace flooring in 730-A Rm167.…
Various glass, ceramic and composite materials are routinely fabricated and characterized at the Aiken County Technical Laboratory (Building 999-1W…
HEPA filters will be removed and the roughing filters will remain.…
HVAC Chiller No. 1 and No. 3 cooling water vent valves are to be replaced with lighter ones and pipe hangers are to be reinforced.…
A load test is to be conducted on Melter Storage Box 3.…
Paint Fire Hydrants and PIV's in F-Area.…
709-1G, Replace tile and wallboard in ladies shower.…