SRSCRO will demolish modular office building 704-16S after removal of all universal waste and dispose of demolition debris in the C
The current Regulated Drain Collection Tank (RDCT) cell sump pump has failed and must be replaced.…
Subcontractor to perform guardrail repairs on Road C.…
Vendor to clean mildew and mold from aboveground Fuel Station Tanks (715-2A, 715-4G, and 715-2N).…
Implement stormwater erosion and sedimentation control improvements within the Savannah River Tritium Enterprise (SRTE) per Work Orders.…
This is a painting job to repaint walls and floors in the HCMA vestibule and adjacent room.…
Repaint the flagpole North of 704-H.…
Remove weeds via pulling, cutting, clipping in the K-Area Sand Filter and Settler Tank Area.…
Prepare Clausing drill press for excess by disconnecting electrical, and transporting to storage.…
EEC for rheometers that use NIST traceable oil standards for verifying the functionality of the instruments.…