Install a Large Receiving Tank for the CPC Purge Air Compressors…
Relocation of Mass Spectrometer System in Building 723-A to Building 234-H…
Replace 234-H Main Side Exhaust Fans and Dampers…
Tritium Extraction Facility (TEF) Open Glovebox Maintenance on GB 3500…
H-Area Integrated Video Assessment System (IVAS) Upgrade…
Removal of Sensors in 249-H Rooms 110 and 112…
Install a new Mass Spectrometer in MS1 location Building 264-H…
Replace Carpet in Conference Rm. 32 in Bldg 234-H HAOM with Vinyl Flooring…
Install Berm Around 780-2A Sump…
Correct Water Intrusion Issues around 105-L…