Replace Carpet In Room 102, 772-F.…
This EEC covers the use of a Labconco benchtop lyophilizer and the lyophilization (freeze-drying) of nonhazardous aqueous samples.…
Remove out-of-service steam line section near 717-A.…
Piping and supports will be modified to support Saltstone Hopper Overflow Container (SHOC) Modifications.…
The loose packing material needs to be removed and replaced and the joint caulked to ensure the packing material does not continue to pull out.…
Water damaged beams in buildings 717-1N, 717-3N, 717-8N, 711-N, 711-2N, 711-9N, will be cleaned and have new coatings applied.…
Verizon Wireless is upgrading the existing Mobile Access Distributed Antenna System (DAS) and multiple repeater sites located on the SRS facility t…
Cone Penetrometer Test to Support SRPPF Design…
Move the trimming and gauging, hot air decontamination (HAD), and final decontamination functions to 233-H, Room 31 in Finishing Line one (FL1).…
Mount VTC equipment to wall in 704-L Conference Room.…