Refurbish 105-L 15 Men's and Women's Restrooms…
Provide labor, materials, services, and supervision to recoat the interior and exterior of the 787-001G elevated fire water storage tank in accorda…
Modification of Test Console Vent Piping in 221-33F.…
Disconnect and remove drum crusher at 645-2N.…
This EEC covers the removal of the inlet HEPA Filters and the respective housings that were used to support Cabinet 25 operations in F091.…
This EEC covers the removal of 3 inlet HEPA Filters and the respective housings that were used to support Cabinet 26 operations in F091. …
Paint restroom at 784-7A.…
730-1B Office cube replacement to consist of removal of old cubes (see 730-1B attachment), then removal of carpet in the area of old cubes, and the…
The proposed activity prepares building 782-1M for deactivation by removing all electrical energy from the structure.…
Renovate the bathrooms and change rooms in 704-L.…