Repair reinforced concrete wall located at the east side of 730-4B building.…
Replace lights in building 789-2B. Use scaffold platforms needed.…
Isolate and abandon electrical services to various equipment in Sample Room No. 1 and No. 2 in 105-L.…
Repair damaged portion of the roof on the west end of building 710-8N.…
Weld repairs and coating on door hinges on the north east end of 711-6N.…
Replace the current A/C unit for Conference Room a with a new Carrier 3-Ton split HVAC unit.…
Scope of this work order is to install a temporary cooling system for the fourth level control room at 221-8H fan house.…
This PLC is obsolete and needs replacement. The existing GS PLC and two remote I/O drops (2 and 3) require upgrading to the latest Emerson DeltaV c…
Replace deteriorated gutter system on north side of 294-H Sand Filter to prevent the accumulation of rainwater on the sandfilter's roof per CDCF-H-…
Renovate the 249-H kitchen (249-H, Room 119B) with new cabinets, countertops, and backsplash.…