Project Y-757 replaces E3S with the Argus Security System for components not already identified by Projects Y-738, Y-732 and Y-724 in the Tritium F…
This modification will replace E3S in the Tritium Extraction Facility (TEF) with the Lawrence-Livermore National Laboratory (LLNL) Argus Security S…
Grade, Pave, Stripe and Add Erosion Control Measures to Existing Gravel Parking Lot at 742-G trailers.…
Caulking in a seam between Transite panel(s) and a concrete wall outside of the K-Area MAC Center and Settler Tank is loose and falling out.…
Perform repairs to the interior of Building 706-N.…
Residual sample material from on-site facilities and/or customers will be dispositioned to SRNL's HAD system once analytical characterization of th…
Chiller systems used to regulate the temperature of R and D instrumentation/devices require a coolant for proper operation.…
Mechanical Testing will be performed in 999-2W Lab 155 including work on the mechanical testing uni-axial load frame and the dynamic thermomechanic…
Retire the 234-H Breathing Air System.…
A thermogravimetric analyzer (TGA) combined with a mass spectrometer (MS) are located in 773-A, C-154/158.…