The goal of the catalyst research is to create innovative materials and intellectual property.…
Renovation of Kitchenette in Building 773-51A Room 134.…
This activity will support the development of equipment and work control documents for the processing of Mark-18A targets.…
Annual Preventative Maintenance (PM) for Miller Syncrowave 250DX/350LX Welding Machines N-Area and F-Area.…
Apply roof coatings and seal roof leaks.…
CX-023340: Inspection and Treatment of Currently Installed Wooden Utility Poles in H-Area (HTF, ETP)
Inspection and treatment of wooden utility and power poles in H-Area (H-Tank Farm and ETP).…
The front wall of offices 253 and 254 shall be relocated to the corner of wall of office 219.…
The Saltstone Process Room Ventilation comfort cooling design is not adequate during periods that personnel are in the Saltstone Process Room perfo…
Remove LCS-37, 38, 39, and 44 Radiation Monitors per DCP No. J-DCP-S-05009 in 221-S.…
A quonset hut (717-50F) is being built in FTF south of the existing structure 717-30F.…