D and R the 234-H tankless water heater in the kitchen and run an insulated domestic water line from the existing 234-H men's restroom water heater…
Install sealant on the UV Unit at Central Sanitary Wastewater Treatment Facility (CSWTF).…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F).…
789-2B Replace ceiling tiles (suspect mold) in operator station.…
Raman and absorption spectroscopy instrumentation will be used in various labs at HTRL to determine the chemical and physical properties of samples…
The Analytical Development Section (ADS) in SRNL performs a variety of dissolution methods.…
The 503-2A Diesel Generator (DG) was installed in 1984 and is functionally classified as General Services (GS) and used as a back-up generator.…
The objective of this work is to analyze for iodine speciation in environmental samples (aqueous and solids) by testing for iodide, iodate and orga…
Establishment and operation of a Rapid COVID Testing Station outside of S-Area (Defense Waste Processing Facility).…
Existing wooden entry stairs and landing platforms at buildings 718-N and 718-20N will be removed and replaced with metal/aluminum units.…