Replace No. 003 Cooling Water Return Pump/Motor located at 281-2H.…
The Classified TEF D/3 Control Systems are currently running D/3 version 12.2.3 on Windows Server 2003, for which Microsoft has discontinued suppo…
Replace flooring in M-15 lab and adjacent corridor due to radiological spill and contamination.…
Small pieces transite material have broken off of exterior surfaces around 105-L and near Steam Station No. 3 Outside Assembly Building.…
Work Orders 1850572, 1857145, and 1850940 were created to implement stormwater erosion and sedimentation control improvements within the Savannah R…
Upgrading the SRS technological infrastructure by installing underground fiber optic cable at various locations across the site.…
Perform structural repairs on 772-F and 772-1F per the structural integrity program (SIP) inspection report T-CLC-F-00557.…
Construction personnel to remove/replace insulation around sump jet piping in Section 17 on the 2nd level.…
A sample gas containing borazine in a collection volume will be connected to a valve system and directed either directly to a residual gas analyzer…
The purpose of this activity is to produce berl saddles coated with silver nitrate for iodine volatization studies.…