Final Deactivation and Decommissioning (D and D) of buildings: 483-3D, 484-5D, 484-9D, 485-D, 607-2D, 607-7D, 607-12D, 607-14D, 607-15D, and the as…
      705-C Repair light switch in Room 168.…
      105-K roof expansion joint repair at between  48 and  62 elevation by subcontractor.…
      Activity involves Safety Basis Upgraded related modifications to the 773-A propane building distribution system.…
      Subcontractor will provide roof replacement on Building 703-46A.…
      Building 233-H Doors 301/08 are old and heavy, and their hinges require frequent maintenance.…
      This EEC is for the DESIGN of the relocation of Recycle Vessel Vent (RVV) No. 1 Fan Assembly in H-Canyon Building 292-H per MTHCA-2021-00005.…
      This activity is an evaluation method that encompasses the use of NIST traceable viscosity standards consisting of a mixture of mineral oil and mix…
      Preparation of salt simulant solutions as well as cementitious waste forms that are representative of waste forms from SRS and offsite for testing.…
      At the A-Area Burning/Rubble Pits and Rubble Pit (731-A, -1A, and -2A)/Miscellaneous Chemical Basin/Metals Burning Pit (731-4A and -5A) Operable Un…