Koldwave recirculation HVAC unit in 773-A, Room C-069 needs to be replaced with a like-for-like unit per WO 01785798 and Procedure TE-49-007.…
Raman and absorption spectroscopy instrumentation will be used to determine the chemical and physical properties of samples by monitoring the inter…
The Radiological Evidence Examination Facility (REEF) will be used by the FBI, under the direct oversight of SRNL, for forensic examination of radi…
Repair/replace roof trough/sheet metal at 711-N, 711-2N, 711-9N.…
Disconnect and remove Rigid saw from weld test area in 711-2N.…
This modification will transition all of the head-end components of the E3S Closed Circuit TV system to IVAS.…
Remove abandoned Load Line 1 Welder Controller and Powerstat.…
709-1G, Replace tile and wallboard in ladies shower. Install new shower insert.…
Fence the 299-H Building out of the Limited Area (LA) as required and meet the needs of the 299-H facility transportation requirements.…
DOE is replacing the current media disintegrator at 703-A with the Solid State Media Disintegrator.…