Installation of an aluminum awning over the wooden deck on building 704-38G.…
      Install Wifi in 706-6F.…
      Install Wi-Fi in 711-2N.…
      Renovate Lab C-159/163 to replace existing gloveboxes, fumehoods and lab casework.…
      This EEC will cover the replacement of two HVAC systems located in 735-A Section-B record storage repository rooms 123 and 125.…
      This actvity installs a new vendor-designed, skid-mounted chemical feed system adjacent to the north side of the 285-11H Cooling Tower return flume…
      Replace old method of estimating flow by installing a flow meter with velocity sensors at the H-12 Outfall.…
      This EEC covers the installation of three Mobile Mini office trailers in H-Tank Farm (HTF).…
      Temporary Modification to provide emergency exhaust for the Salt Solution Receipt Tank (SSRT) Process Vessel Vent (PVV) System to maintain National…
      Activity 1 includes repairing a broken and eroded culvert and a storm drainage pipe located on the east side of building 211-44F. Activity 2 includ…