The 235-H Conference Room (Room 121) current HVAC supply is inadequate when the room is at medium to full capacity.…
Steam line insulation removal to identify and fixed leak upstream of Valve PSS-V-7703.…
711-2N, Install 1 Universal Wiring drop in room 13.…
Install 2 new fuel oil heaters in building 711-N (the Iron Workers shop area).…
Activity covers the instillation of a Sunpower Cryotel GT cryocooler in the KIS Vault for use with the Prompt Gamma/Gamma Isotopic System (PG/GIS).…
Install two (2) metal Quonset Huts to support the construction workforce in S-Area Laydown Yard.…
The Saltstone Dry Material Pre-Mix Screw Feeder is to be replaced due to it being obsolete.…
Attach approximately 1,056 square feet of 4’ X 8’ sound absorbing acoustical tiles on walls in Buildings 730-B (Rm 333), 730-2B (10'x20' room) and …
Replace 37 entrance doors at the B-Area trailer complex.…
Install 9 Universal Wiring (UW) drops in Building 772-F, Room 102.…