The Barnwell Warehouse has multiple hydraulic units that were intended for the shuttered MOX project.…
Apply coatings to the roof of the occupied/office area section of 713-1N, seal leaks and repair the gutter on the north side of 713-1N.…
Excess 36" bandsaw and replace with 24" bandsaw in Building 717-8N.…
A renovation of the area will be performed prior to the installation of the new CNC Mill.…
The coolant will be drained and replaced with new coolant.…
705-N Dining Room Renovation.…
234-H Inert HVAC Installing conduit for damper controls.…
D and R the 234-H tankless water heater in the kitchen and run an insulated domestic water line from the existing 234-H men's restroom water heater…
Install sealant on the UV Unit at Central Sanitary Wastewater Treatment Facility (CSWTF).…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F).…