Renovate 211-8H Lunch Room with new flooring, ceiling tile, paint, and appliances.…
Replace lights with LEDs at 713-N Tool Room.…
Disconnect and remove Do-All saw from Bldg. 711-N.…
Install explosion proof light fixtures at Buildings 763-118N and 763-119N.…
703-46A, Install CAT6 cable from room 123 to 113.…
Powdered materials for use in additive manufacturing (3-D printing) will be mixed using the Turbula mixer in 999-1W.…
The objective of this work is to analyze for iodine speciation in environmental samples (aqueous and solids) by testing for iodide, iodate, and org…
The goal of the catalyst research is to create innovative materials and intellectual property.…
Renovation of Kitchenette in Building 773-51A Room 134.…
This activity will support the development of equipment and work control documents for the processing of Mark-18A targets.…