Remove HVAC Unit RTU-4 and replace with a new 7.5 ton cooling unit on the roof of Bldg. 704-N.…
Repair and replace asphalt at Buildings 713-N and 716-N.…
Roofing Repairs at 105-K, 34 Far Side.…
Security requires the addition of a fighting station inside the outer Restricted Area concrete block barrier, north of the KCCO Storage Pad (163-70…
A lower pressure loading capability is needed for Inert Loading Line 2.…
Remove the Inert Metallography Laboratory Tritium Recovery System (IML TRS) process chiller from service by providing air gap isolation of the chil…
Replace pipe flange on the HM Trailer east of 772-F.…
EandI Perform Layup Activities in Chase 163 by identifying and removing PCB ballasts from fluorescent light fixtures and removing fluorescent bulbs…
This work scope is to improve the drainage around the west sides of 772-F and 772-1F.…
Repairs will include but are not limited to air gapping and removal of conduit, excavation of unsuitable soil, compaction of soil, replacement of n…