704-C Remove/replace carpet.…
Maintenance to upgrade SRTE lamps with LED.…
Relocate DI (Deionized) Water Supply 284-H.…
Install Universal Wiring (UW) in Building 706-5F.…
Replace neutralization tank located under lab sink in 782-3A.…
Lab modules C-142/146 and D-1169 are being renovated to house a new mission, Crystal Growth Lab for Nuclear Detection.…
Inspection and treatment of 115KVA poles south of SRS and crossing B-Road.…
Subcontractor will provide roof repairs at 704-H.…
Replace carpet, tile, and cove base in 705-C.…
Subcontractor will provide roof repairs at 790-4B.…