Install Universal Wiring (UW) in Building 706-5F.…
Replace neutralization tank located under lab sink in 782-3A.…
Lab modules C-142/146 and D-1169 are being renovated to house a new mission, Crystal Growth Lab for Nuclear Detection.…
Inspection and treatment of 115KVA poles south of SRS and crossing B-Road.…
Subcontractor will provide roof repairs at 704-H.…
Replace carpet, tile, and cove base in 705-C.…
Subcontractor will provide roof repairs at 790-4B.…
The oil-filled windows for Building 773-A Shielded Cells 7, 9, and 13 are in need of replacement due to significant oil leakage, which is causing a…
HRTL Lab 144 (HRTL High Bay) is utilized by the Hydrogen Isotopic Processing Section for the Hydrogen Processing Demonstration System (HPDS.)…
Generator (MG) sets in 251-F are reaching end of life expectancy and require a considerable amount of maintenance.…