Install a blank on Duct 7902 in 233-H Room 10 supply register.…
Replace the airtrol tank fittings on the furnace 1 and 2 cooling water expansion tanks with a designed fitting using swagelok parts.…
233-H Tritium Air Monitoring Sample Point valve K-51 M-R1 will be removed and blank pipe flange installed.…
The current TEF FORMS Monitor Cabinet utilizes an obsolete DOS based operating system PC for its control functions.…
Run new conduit and conductors from disconnect.…
Install an automatic transfer switch (ATS) to provide two different sources of electrical power to lighting panel PNL PP1 in Building 703-44A.…
This activity involves the removal of a bead blaster machine from 716-N.…
The HANM Classified D/3 DCS 16000 I/O modules in PCM-13 that interface with field instruments and controls have exceeded end of life.…
Project Y802 supports SRNL R and D Engineering in installing a new mass spectrometer room in Building 723-A per MT-SRT-2020-00004.…
This EEC covers the operation of the AccuTOF-DART time-of-flight mass spectrometer…