This EEC is for the design to update valve actuator and limit switch for H-233000-DET-HV-1267331 (aka DS-118) per M-DCF-H-13811.…
Clean Air Handling Unit (AHU) No. 5 drain line at Building 772-F.…
702-A Water Intrusion Recovery.…
Proposed modificaton installs electrical componets for Saltstone Screw Feeder System upgrade.…
Construction to pour concrete pad for outdoor unit installation East side of 704-72S and install Ductless Heat Pump on pad and install three High W…
Install an open steel shed to park/protect government equipment.…
This EEC covers the testing and disposal of a propietary ZAO Non-Evaporative Getter (NEG) that will be obtained from SAES Getters through a nondisc…
This EEC covers the operation of the Extrel TDS system located in EMRL 999-2W Lab 196. …
Establishment and operation of a Rapid COVID Testing Station outside of 735-4B.…
Dismantle and remove 210-S Control Room Chiller No. 1 (EN/EP No. S-210-580-010-00) and 210-S Control Room Chiller No. 2 (EN/EP No. S-210-580-015-00…