This activity is for completion of Safe Shutdown thru Phase 1 Deactivation of 237-H/238-H/238-1H facilities.…
This activity is for completing deactivation of the 236-H By-Product Facility.…
Removal of water, soil, and gravel will be required along with necessary repairs to prevent future wash-outs.…
Replace HT-TCAP Hydride Beds in Building 233-H.…
MOX-Termination has determined that portable building 252 (aka SRS-PB-01072) is now excess.…
782-3A Restroom floor repair.…
Extend breakroom on south side of Bldg. 717-8N.
The EEC covers the renovations for the interior of building 713-1N.…
704-1N carpet replacement.…
This EEC covers all maintenance work performed by SRNS Organizations on steam lines located at SRS.…