Replace existing General Services (GS) hydrogen supply isolation valves with new Safety Significant (SS) valves.…
Electrical load consolidation from Motor Control Center (MCC) MCC-32M1 to MCC-38M1.…
Subcontractor will provide roof repairs at 225-6H. The Subcontractor “will not” disturb the existing roof while performing these repairs on 225-6H.…
705-H Replace ceiling tiles damaged due to water intrusion.…
Mount a utility pole and associated parts at the 730-1B Rally Point in order for a Solar Powered Wireless PA to be installed.…
This activity is needed for the placement of two (2) 44' x 52' concrete pads and three (3) sealands (263-289H, 263-290H, and 263-291H).…
Prepare nonradioactive salt simulant solutions that are representative of waste streams from SRS and offsite for testing.…
Support of MCU operations will require the preparation and use of a combustible solvent mixture.…
Renovations to 725-N, Room 1 flooring in Central Shops.…
Subcontractor shall remove propane from the Lead Melter Propane Tank at 711-4N and the 716-4N PECMC Propane Tank so Construction may replace the fa…