Piping will need to be removed and worked to fit the new filter. Some piping components will be replaced.…
Subcontractor will provide roof repairs at 705-H.…
Subcontractor will provide roof repairs at 249-H.…
Apply roof coatings and seal roof leaks.…
722-N, Remove carpet/tile and cove base due to water intrusion.…
Seven (7) data lines will be installed in room 422 of 105-L.…
The attached Scope of Work provides details for the replacement of PIV 2070, which will be replaced with PIV 2230.…
The PA is to remove a thermally actuated valve that is currently integrated into the fire suppression system (FSS).…
Temporary Modifications (Temp Mod) 264H-TMC-19-270 and 264H-TMC-19-271 utilize tubing, regulator, PSV, and associated fittings to provide a bypass …
This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is NOT required.…