The Stratasys Rapid Prototyping Machine was purchased to support research and development. …
Reroute condensation drainpipe from Air Handling Unit (AHU) catch pan on the second level of 713-1N (northwest corner).…
704-N Remove wall between rooms 12A and 12B.…
Kitchenette enhancements to be done in 704-K Room 14.…
The adsorption of different gases (hydrogen, oxygen, neon, argon, krypton, xenon) on metal particles (silver, gold, copper, palladium, platinum) an…
This EEC covers various routine maintenance activities that occur in the buildings within the MOX Complex Area.…
This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…
Remove Asbestos Presumed Asbestos Containing Material (PACM) gaskets, then remove leaking valve RWW-101 and replace with new valve, reinstall insul…
The proposed activity involves repositioning of copper service lines in 773-A C-143/147 (RBA).…
Project Management and Construction Services (PMCS) will be installing a new electric plant air compressor near Building 725-2N.…