The 16A Ferrous Sulfamate (FS) Automatic Control Valve (HQ-13) is no longer able to be remotely operated and is impeding the addition of FS to Tank…
As part of the R-Area Groundwater monitoring network, the Core Team (DOE, DHEC
This deactivation includes electrical isolation of Building 235-F, which disables the installed lighting within the building (See EEC No. CBU-F-201…
The primary objective of this sampling activity is to collect sediment and surface water samples that provide confirmation data to support closure …
Remove and install flooring in Building 773-A, E-Wing, Room E-031.…
Ductwork will be repaired and insulation will be replaced as needed per WO 1832178.…
Remove abrasive blasting media and filter from bead blaster currently in building 711-N and excess equipment.…
D and D small office from the north side of 713-N.…
In various locations in K-Area, obsolete lighting contactors to be replaced with new ones.…
Portions of the K-Area Restricted Area will be repaved (asphalt top finished) to improve access and road conditions within the K-RA.…