Construction Personnel will dismantle and remove Building 701-35H.…
Electical receptacles to be installed in the Clerk and Shift Managers Offices in Building 105-K.…
Replace the existing Carbon Steel Nitrogen Exhaust Line for the SAS glovebox with Stainless Steel Piping and remove the old Dewar manifold.…
Install a permanent ventilation system for the Sodium Nitrite Makeup Tank (SNMUT) to allow tank to vent directly to the atmosphere at the 422-S roo…
Replace the old monitoring system with new technology (laser flow sensor) at the H-02 Outfall.…
Site construction will prep and paint the curbs and traffic stripping around the exterior of 735-4B.…
The Li'l Critter pump in building 723-A is used for pressure testing. Replacement of the Hydraulic Oil and process fluid in the Li'l critter pump i…
This EEC covers various general renovations for buildings 725-N, 725-1N, and 725-2N in Central Shops. This revision includes the installation of ad…
Laser sensor mounted on culvert to measure stream flow at A-11 Outfall culvert.…
Removal of rail in 400-D Area.…