Kitchenette enhancements to be done in 704-K Room 14.…
The adsorption of different gases (hydrogen, oxygen, neon, argon, krypton, xenon) on metal particles (silver, gold, copper, palladium, platinum) an…
This EEC covers various routine maintenance activities that occur in the buildings within the MOX Complex Area.…
This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…
Remove Asbestos Presumed Asbestos Containing Material (PACM) gaskets, then remove leaking valve RWW-101 and replace with new valve, reinstall insul…
The proposed activity involves repositioning of copper service lines in 773-A C-143/147 (RBA).…
Project Management and Construction Services (PMCS) will be installing a new electric plant air compressor near Building 725-2N.…
This EEC is for the design to update valve actuator and limit switch for H-233000-DET-HV-1267331 (aka DS-118) per M-DCF-H-13811.…
Clean Air Handling Unit (AHU) No. 5 drain line at Building 772-F.…
702-A Water Intrusion Recovery.…