This work will provide installation of vent line piping to each of the four existing Gas Chromatographs (GC) hoods located in 735-11A Lab 135 for a…
Office of NEPA Policy and Compliance
November 1, 2021This work will provide installation of vent line piping to each of the four existing Gas Chromatographs (GC) hoods located in 735-11A Lab 135 for accepting the GC equipment exhaust vent line hose and redirecting the exhaust stream to the building Central Hood Exhaust system (CHEX) for removal