Install voice only drop in Building 766-H.…
Install additional roof security barriers to the Main Tritium Entry Control Facility (Building 701-3H).…
Several passive fire protection features in Building 233-H have deficiencies which could potentially degrade their performance in the event of a fi…
This DCF is replacing HPN-PIT-3 and LPA-PIT-3 with new pressure transmitters and removing wireless transmitters that are beginning to fail.…
Old lathe will be dismantled and removed from Section 7 of the IML Glovebox. …
904-43G Pressure wash/touch up paint Hooterville Fill Station. Safety yellow areas have faded due to normal wear and exposure to weather…
Unplug Steam Line 773-A, C-006…
This task includes preparation of a simulant of a high salinity waste stream at the Fukushima Daiichi Nuclear Power Plant followed by testing of de…
Repair and replace windows at Building 725-N.…
719-5N Prep/replace flooring.…