Remove and Replace Two Wooden Pedestrian Bridges to the South of Building 706-2F.…
Due to a demand for portable power in F-Tank Farm, 2 Diesel Generators have recently been processed for eligibility in our Reciprocating Internal C…
Remove Restroom Trailer 245-10F to the SRS Community Reuse Organization (CRO) laydown yard for future disposition.…
Replace Fire Alarm System in Building 703-47A.…
Remove out-of-service steam line section near 717-A.…
The purpose of this activity is to modify/improve mechanical properties for a thermosetting polymer extrusion process.…
Testing will be performed in the 773-A E-wing Shielded Cells to assess the impact of increased fissile loading in glass on glass durability.…
Replace existing General Services (GS) hydrogen supply isolation valves with new Safety Significant (SS) valves.…
Electrical load consolidation from Motor Control Center (MCC) MCC-32M1 to MCC-38M1.…
Subcontractor will provide roof repairs at 225-6H. The Subcontractor “will not” disturb the existing roof while performing these repairs on 225-6H.…