Install additional receptacles in Building 736-A, Room 131.…
Repair and Replace Packing of 1 Steam Valve Outside of K-Area Purification and 2 Steam Valve Inside of Purification…
SRNL Research and Development Engineering will be conducting a fire suppression test in 723-A to support the Surplus Pu Disposition Project in K-Ar…
Venting or direct-shipment and disposal of specialty gas cylinders, nitrogen, carbon dioxide, compressed air, in A Area.…
The subcontractor shall replace wooden line switch ties from the railroad bed, identified by site transportation and engineering as part of the 202…
Perform structural repairs on 772-F and 772-1F per the structural integrity program, SIP, inspection report T-CLC-F-00557.…
Install Universal Wiring, UW, drops in Building 730-2B.…
This proposed activity will install a spill containment box and vapor stimulator tubes at 254-5H Fuel Oil Underground Storage Tanks, FOUSTs, to all…
This ongoing activity includes the operation of several gas chromatographs and a liquid chromatograph and mass spectrometer in 735-A, 735-11A and 7…
Subcontractor will provide roof repairs at 713-3N.…