To provide building transition section, plenum, details for portable HVAC unit for 105-13K building.…
The 233-24H warehouse building heat pump is being replaced and utilizes slightly different controls.…
Renovate the 264-1H Rm 151 kitchen with new flooring, paint, countertops, and cabinets.…
LED upgrade of exterior lighting of building 247-H…
A vendor will generate and or remove excess wastewater from various systems and containments located across SRS.…
Subcontractor will provide roof repairs at 717-F.…
Subcontractor will provide roof repairs at 706-6F.…
Subcontractor will provide roof repairs at 703-B.…
This activity will evaluate the chemistry and engineering aspects of a process for stripping chloride from nitric acid solutions using heat, gas sp…
This activity is for the demolition of Building 717-33F, which is also known as MOX Building No. 90, and the removal and relocation of MOX sealandc…