The Process Technology Programs, PTP, will conduct laboratory scale simulations of the Defense Waste Processing Facility, DWPF, process at the Aike…
Install two new pieces of equipment, a Flying Probe Tester and an air compressor in Building 730-A.…
Remove and replace 922 Condensate Tank Pump A in -20 of 105-L.…
NDE Inspection of the DBCF underground piping.…
The existing 217-H Air Handling Unit, HQ-234000-HVAC-AHU-53.007, will be replaced.…
Replace and remove lighting fixture for outside roof lights on 292-2F with LED upgrade.…
Replace the 720-2A Automatic Transfer Switch, A721-600-ATS-01, due to suspected lightning strike.…
Repair deteriorated I-Beam at 716-N.…
Remove heat exchanger plug covers and seal plugs and joints with Blue Max.…
Modify and test applicable components of the 292-S Diesel Fuel Oil, DFO, Underground Storage Tanks System to include epoxying the spill buckets ass…