Activity 1 includes repairing a broken and eroded culvert and a storm drainage pipe located on the east side of building 211-44F. Activity 2 includ…
Office of NEPA Policy and Compliance
May 5, 2021Activity 1 includes repairing a broken and eroded culvert and a storm drainage pipe located on the east side of building 211-44F. Activity 2 includes the removal of overgrown bushes and rip rap stones which have settled in front of inlets which collect water from Area 9 and discharge into Basin 500.