Vendor will pressure wash screens for Deepwell 905-108H.…
Install carpet and paint room A129 in 772-F.…
Install hands free water dispensers in 704-C, 703-43A, and 704-N.…
Six, 6, new hard wall offices will be constructed on the 2nd floor of Building 730-B.…
Remove and replace floor tiles in select portions of the Purification Area within the K-Reactor, and prep and paint select wall locations.…
Remove both Uninterruptible Power Supply, UPS, systems in Building 234-H, Room 340 to provide addtional work space in the area.…
Under project Y757, the E3S system was replaced with the Argus Security System in 234-H.…
The 701-3H Entry Control Facility into the Tritium Limited Area, LA, is currently an unoccupied space.…
Make repairs to floor of 704-37E and 704-29E.…
Install hands free water dispensers in 704-C, 703-43A, 704-N, and 703-46A.…