Fabricate glovebox window channel gaskets by cutting glovebox window channel gasket material and adhering mitered edges using Loctite 404. Install …
Tritium Extraction Facility (TEF) Open Glovebox Maintenance on GB 3500 to replace GB recirculation blower motors and potential implementation of Te…
Metallography examination of contaminated samples will be performed.…
Activities involve the use of small quantities of VOCs which are used for daily operation (e.g. instrument component cleaning, house keeping, etc.)…
Corrosion testing is routinely performed to support SRS facilities, including the tank farm, DWPF, H-Canyon, L Basin, and K-area Complex, as well a…
Final Deactivation and Decommissioning (D and D) of buildings: 483-3D, 484-5D, 484-9D, 485-D, 607-2D, 607-7D, 607-12D, 607-14D, 607-15D, and the as…
705-C Repair light switch in Room 168.…
105-K roof expansion joint repair at between 48 and 62 elevation by subcontractor.…
Activity involves Safety Basis Upgraded related modifications to the 773-A propane building distribution system.…
Subcontractor will provide roof replacement on Building 703-46A.…