CX-025703: Contingency Plan for Building 233-H DE Vessel Replacement with CMG Vessel

The proposed solution addresses the requirements for the design, installation, and performance testing of replacing Diffuser (DI) System DE Vessel …

Office of NEPA Policy and Compliance

February 28, 2022
Estimated Read Time   min

The proposed solution addresses the requirements for the design, installation, and performance testing of replacing Diffuser (DI) System DE Vessel with the form and function equivalent CMG (catalyst material in a getter bed) Vessel.