Replace Strainer Blowdown Valve A-736000-MST-V-4560 at Building 736-A.…
Remove presumed asbestos containing material gaskets and replace Plastic Relief Valve PSV-001 on Phosphate System at Building 789-B.…
Remove domestic water well pump motor at 905-67B. The motor is going to be rebuilt. The presumed asbestos containing material gasket material at th…
The gaskets between the flanges on the #4 river water pump have to be removed. This will allow construction to bead blast the river water pump. The…
Where reasonable and economically feasible, replace High Intensity Discharge fixtures with light emitting diode equivalents. …
Replace the failed Automatic Transfer Switch (ATS-03) in Building 105-L. The model is not longer manufactured. Some disassembly and removal of elec…
Excavate and repair underground domestic water leak near Building 292-S.…
Abrasive blasting steel structures for coating applications performed by construction forces in the 725-2N Blast Building/Yard. …
This environmental evaluation checklist covers analytical methods to be performed in 773-A Labs B-003, B-046, B-105, B-107, B-138, B-145, B-154 and…
Savannah River National Laboratory will perform laboratory experimentation to determine the flowsheet parameters necessary to safely and efficientl…